131美女视频黄的免费千百音|狠狠色伊人久久精品综合网|欧美理论中文在线观看|国产精品亚洲无码

NewsHome > News > Company news

Significance of continuous slipform paving for bridge deck curb stone slipform paver
release time:2020-3-21 15:33:07      hit count:2183

   With the speeding up of highway construction in China, the paving technology of cement concrete pavement slipform machinery-curbstone slipform paver has been widely promoted and applied, and more and more large, large, medium and small bridges, overpasses, The technical problems of mechanized pavement of single-double-layer reinforced concrete bridge (culvert) surfaces of passages, culverts, and bridgeheads need to be solved through research and engineering practice.

93ab75558c0586a545d12cac6dae8d7.jpg

   Due to the high overall smoothness and durability required of highways, technically, cement concrete pavements, reinforced concrete bridge decks, and reinforced concrete decks at bridge heads are required to achieve continuous paving by curbstone slipform pavers. In order to improve the overall smoothness of the cement concrete pavement, the pavement of extra large, large, medium and small bridges, culverts and passages is paved with curbstone slipform paver when the pavement is slipped. In this way, a high-density, high-flatness bridge deck with the same quality as a slipform paving cement concrete pavement can be obtained. When a motor vehicle runs through these continuously paved bridges (culverts) at high speeds, it is not felt that they are passing through the bridges and culverts, and there is no bumping vibration bumps and no need to decelerate.

   Along the highways in China, due to the large population and dense villages, except for some remote provinces and regions, on average there are more than 3 bridges and culverts and passages per kilometer of highways. If we use the curbstone slipformer for mechanized construction, we can only pave the pavement, and we cannot continuously pave the reinforced concrete bridge deck. The bridge (culvert) surface and the slab are manually constructed, which will inevitably cause slipform machinery that will seriously affect the cement concrete pavement The speed of construction prevents the benefits of large slipform machinery from being fully utilized. On the other hand, the construction quality and overall flatness of the bridge and culvert pavement on the expressway are reduced.

   Objectively, highways, regardless of the cement concrete pavement and reinforced concrete bridge deck, must use curbstone slipform to talk about the pavement mechanized pavement construction technology to ensure its construction quality. Otherwise, the manual construction method will continue to be used. Under such a strong destructive force on the highway, the bridge deck pavement layer cannot be resisted, and serious damage may occur 3 to 5 years after opening to traffic. Currently, rigid bridge deck pavement Repair of the coating is quite difficult.


Previous: Omnidirectional concrete curbstone slipform paver-New curb NC1300
Next: Welcome Minister Xu Donghai and his party to visit our company to inspect and guide our work

Back to list

News you are interested in
新巴尔虎右旗| 九龙城区| 平山县| 阳城县| 万全县| 洪湖市| 乾安县| 嘉义市| 安福县| 金湖县| 甘谷县| 睢宁县| 鲁山县| 柳州市| 平利县| 永德县| 肇州县| 新营市| 呼和浩特市| 洛宁县| 沙田区| 湘潭市| 缙云县| 苏尼特右旗| 察雅县| 崇义县| 高碑店市| 牡丹江市| 崇州市| 郸城县| 基隆市| 广西| 高雄市| 博爱县| 永登县| 满洲里市| 微山县| 湖南省| 灌阳县| 周口市| 广西|