131美女视频黄的免费千百音|狠狠色伊人久久精品综合网|欧美理论中文在线观看|国产精品亚洲无码

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2000

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
高台县| 浦城县| 牡丹江市| 镇原县| 古蔺县| 望城县| 彭水| 友谊县| 新野县| 江北区| 祥云县| 黑龙江省| 沅江市| 松阳县| 克东县| 当雄县| 东城区| 托里县| 大余县| 山西省| 赞皇县| 景德镇市| 蓬溪县| 南京市| 海伦市| 留坝县| 大渡口区| 迭部县| 阿拉善盟| 彰化县| 葵青区| 萨迦县| 汕头市| 法库县| 武胜县| 响水县| 紫金县| 禄丰县| 东乡| 汽车| 巴里|