131美女视频黄的免费千百音|狠狠色伊人久久精品综合网|欧美理论中文在线观看|国产精品亚洲无码

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1945

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
冕宁县| 德清县| 屏山县| 怀宁县| 孟连| 思南县| 运城市| 攀枝花市| 灵石县| 廉江市| 商城县| 新巴尔虎左旗| 洪洞县| 托克逊县| 民乐县| 禄丰县| 霍城县| 金秀| 兰溪市| 含山县| 尤溪县| 祁门县| 海丰县| 偏关县| 股票| 志丹县| 金川县| 沁水县| 宁陕县| 镇江市| 禹州市| 新邵县| 广宗县| 齐河县| 郎溪县| 中西区| 自贡市| 磐安县| 太白县| 民勤县| 观塘区|